news

Framework contract started with CAP Holding, a public industrial company that manages the integrated water service in the Metropolitan City of Milan, for technical consultancy in the engineering-hydraulic field and for the verification of the hydraulic risk pursuant to the DGR 18 June 2018 n.XI / 239 on wastewater treatment plants.

The contract will last for 3 years and will include the execution of detailed hydrodynamic analyses, with two-dimensional modelling, of the main water bodies of the area, with verification of the risk conditions for the current state and following interventions.

Leave a Reply

Your email address will not be published. Required fields are marked *

Post comment