1976
From the experience of a group of professors and young engineers from the Polytechnic of Turin, in December 1976 H.C. Hydrodataconsult was founded. The company’s team immediately developed diversified and multidisciplinary skills: from engineering services, to studies and research in the hydrological-hydraulic-environmental field, to technical-economic and organizational consultancy.
Reference orders
1978
With the drafting of the Hydrogeological Plan for the Toce river basin, the collaboration with the Piedmont Region in the field of planning and management of water resources was born.
1970s - 1980s
Hydrodata develops SIMPO projects, relating to the multi-use regulation of the Po, river arrangement for flood protection and navigation of inland waters.
Historical passages of the company structure
1981
The Models and Measurements Laboratory was established, which operates on the entire field of hydrological, hydrogeological and water quality monitoring.
Reference orders
1983
Hydrodata becomes a consultant for Autostrade per l’Italia in the field of the design of hydraulic works and geotechnical-structural interventions necessary to protect infrastructures on a national scale.
1986
Hydrodata begins its collaboration with ENEL S.p.A., with hydraulic studies and surveys for the construction of the Trino V. (VC) nuclear power plant.
1988
With the study on the evaluation of the effects due to artificial floods or consequent to a hypothetical collapse of the dams in the Orco valley, the collaboration with the Municipal Energy Company of Turin – AEM S.p.A. was established.
Historical passages of the company structure
1990
H.C. Hydrodataconsult becomes Hydrodata S.p.A.
1991
Hydrodata becomes a permanent partner of DHI (Danish Hydraulic Institute), a world leader in applied research and implementation-dissemination of codes for hydro-informatics simulation.
1999
Hydrodata becomes a member of OICE-Confindustria.
Reference orders
1994
Collaboration with the Po River Basin Authority and the Liri-Garigliano and Volturno River Basin Authority begins to support planning on hydraulic and hydrogeological risk.
1996
With the Preliminary Study for the development and implementation of the Regional Plan of Hydroelectric Resources of the Autonomous Region of Valle d’Aosta, it started the collaboration with the Compagnia Valdostana Acque – C.V.A. S.p.A.
1999
Hydrodata intensifies its activities in the hydroelectric sector, working for the main national players and for self-producers: revamping of plants, assistance with authorisation paths, due diligence and support for Merger & Acquisition activities.
Historical passages of the company structure
2005
Hydrodata, through its main shareholder INTECNO, joins the structure of MAIRA S.p.A.
Reference orders
2000-2010
Hydrodata collaborates with the Piedmont Region, in collaboration with the East Sesia Irrigation Association, for an integrated management strategy and multiple use of the resource, with projects for artificial reservoirs and related dams (in Val Mastallone, on the Strona di Briona, on the Maira) and with master planning operations in the Baltea-Sesia-Ticino and south-western Piedmont territorial districts.
2000-2023
Hydrodata begins to collaborate and support, in the field of integrated water services, ATOs and operators in the preparation of business plans, area plans and economic-financial plans, in the definition and evolution of tariffs, as well as in management schemes.
2002
Hydrodata develops surveys and studies aimed at the preparation of the Water Protection Plan of the Piedmont Region.
2003
The collaboration with the Piedmont Region (later ARPA Piemonte) for the management of the instrumental hydrometric monitoring network and the production of daily hydrometric bulletins and regional hydrological annals begins.
2005
Hydrodata begins its collaboration with Tirreno Power S.p.A. in the management of its reservoirs.
Over the years it has designed for Maira S.p.A., it builds and manages, with a view to generating and effectively managing externalities for the benefit of the local community, 3 hydroelectric plants in the Maira Valley (about 5MW installed).
2007
An important collaboration with SMAT (Società Metropolitana Acque Torino) begins for the aqueduct of the Susa Valley: preliminary, definitive and executive design of the aqueduct adduction backbone between Bardonecchia and the gates of the metropolitan area of Turin.
2010
SINA S.p.A. appoints Hydrodata for studies and final design of the hydraulic works relating to the road and rail access to the bridge over the Strait of Messina.
Passaggi storici struttura società
2017
Hydrodata is a member of Hydroaid, the International School of Water for Development.
Reference orders
2011
Hydrodata begins its collaboration with Enel Green Power S.p.A. both in the construction of new plants and revamping of hydroelectric power plants in Italy and abroad, and in the management/testing of the DMV release constraint at the outlets of hydroelectric plants in Piedmont.
2015
The collaboration with the Puglia Region begins as part of the updating of the Water Protection Plan, which then continues in support of the preparation of the flood retention basins of some regional reservoirs.
On behalf of Syndial/ENI, Eni Rewind has now begun its collaboration on the remediation of polluted sites.
2017
Hydrodata begins its collaboration with A2A with hydraulic civil engineering design services on hydroelectric plants in Italy.
Hydrodata participates in a project funded by the World Bank for the management of flood risk on some basins in Vietnam.
2018
Hydrodata consolidates its collaboration with the main utilities for the management of the integrated water service in Veneto: revamping of plants, executive projects.
Hydrodata collaborates with the Municipality of Milan for the revision of the geological, hydrogeological and seismic component, for the adaptation of the hydrographic network and for the adaptation of the PGT to the Flood Risk Management Plan.
2019
Hydrodata has been awarded the tender for the spillway project on the Bisagno stream in Genoa for the Liguria Region.
The collaboration with Acquedotto Pugliese for the adaptation and districtualisation of the water network in Puglia begins.
Passaggi storici struttura società
2020
Since October 2020, ALPERIA, South Tyrol’s leading energy service provider and one of the most important sustainable energy companies in Italy, has been the main shareholder of Hydrodata, but it is also a partner that offers multiple possibilities for collaboration and synergies, both in the development of hydroelectric assets and in innovation and research projects focused on water.
Reference orders
2020…
ARPA Piemonte has confirmed the assignment for the maintenance/management of the hydrometric monitoring network of the Piedmont Region.
2020…
Hydrodata continues its collaboration with Autostrade SpA for the inspection and verification of the risk conditions of minor crossings. For TECNE it conducts hydrogeological studies and surveys on the main motorway sections.
2020…
The Puglia Region entrusts Hydrodata with the development of the Hydromorphological Monitoring plan of the surface water bodies of the region for watercourses and reservoirs.
2020…
Continuation of technical and administrative due diligence by Hydrodata in the valuation of hydroelectric plants constituting national hydroelectric assets in M&A transactions.
2020-2023
Support to the City of Turin for the preparation of specialised documents in the context of the final and executive design of river works for the restoration of the navigability of the Po River, “TURIN, ITS PARK AND ITS RIVER: MEMORY AND FUTURE”.
2020-2022
For the Sicily Region, Department of Civil Protection Seismic and Volcanic Risks Service, Level 1 (MS1) seismic microzoning studies were carried out in the municipalities of Sicily affected by Etna seismic-volcanic events - Lot B Palermo. Approved 02/08/2023 by the National Technical Commission (Civil Protection Department).
2021
Four-year framework agreement divided into technical design services for the construction of works referred to in the “Program of interventions for the mitigation of hydraulic risk of regional interest relating to the Sarno River basin” in the Campania Region.
2022
Drafting of the ATO2 Vercelli-Biella-Casale Area Plan.
2023
Agreement with the Southern Apennines District Basin Authority for consultancy and feasibility studies and analyses relating to the management and balance of sediments and the arrangement of the territory’s river basins.
2023
Three-year framework agreement with Tirreno Power for engineering, hydraulic and environmental monitoring services for dams and hydroelectric plants in Liguria, Piedmont and Emilia Romagna.